Chapter 15 of 15

Your Build Plan

A staged roadmap, an architecture checklist, and a launch-readiness scorecard. I wanted this section to explain not only what changed, but why the previous approach stopped being enough once the product met real operating conditions.

  • A staged implementation roadmap
  • Architecture checklist
  • Questions to answer before coding
  • Launch-readiness scorecard

Staged roadmap

  • Stage 1: Single-shot generation with a clear, narrow input type. I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Stage 2: Durable workspace with real files, history, and diffs. I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Stage 3: Tool-using agent loop with a policy-bound execution boundary. I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Stage 4: Validation and repair loop with structured failure feedback. I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Stage 5: Multi-tenant accounts, entitlements, and usage tracking. I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Stage 6: Publishing, deployment, and rollback with real operational proof. I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Stage 7: Commercial workflow that turns output into business value. I would treat this as a checkpoint with evidence attached, not just a box to tick.

Architecture checklist

  • Provider-neutral orchestration boundary I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Explicit tool policy (paths, commands, timeouts, output limits) I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Isolated, resource-limited execution environment I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Structured, bounded failure reporting I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Tenant-scoped data model from day one I would treat this as a checkpoint with evidence attached, not just a box to tick.
  • Human approval point on customer-facing automation I would treat this as a checkpoint with evidence attached, not just a box to tick.

Questions to answer before coding

  • What is the durable object in this product? I would answer this with the actual current system behaviour, not the intended design on a diagram.
  • What tools does the agent need, and what is the worst thing each one could do? I would answer this with the actual current system behaviour, not the intended design on a diagram.
  • Where does generated code or content actually execute? I would answer this with the actual current system behaviour, not the intended design on a diagram.
  • What happens when the model is wrong - who or what catches it? I would answer this with the actual current system behaviour, not the intended design on a diagram.
  • What is the plan for a second tenant, not just the first user? I would answer this with the actual current system behaviour, not the intended design on a diagram.

Launch-readiness scorecard

  • Security: tool boundary, secret handling, tenant isolation - proven or assumed? I would answer this with the actual current system behaviour, not the intended design on a diagram.
  • Recovery: rollback and restore - tested under real failure or only in theory? I would answer this with the actual current system behaviour, not the intended design on a diagram.
  • Deployment: provider-backed and repeatable, or manual and one-off? I would answer this with the actual current system behaviour, not the intended design on a diagram.
  • Operations: usage, cost, and error visibility - present or missing? I would answer this with the actual current system behaviour, not the intended design on a diagram.
  • Commercial: billing, entitlements, and value tracking - wired up or deferred? I would answer this with the actual current system behaviour, not the intended design on a diagram.